Everything between the trial pit and the design parameter
Field investigation, laboratory testing and specialist assessment, delivered by one team, so nothing is lost between the rig and the report.
10 service lines · 310 test methods · IS, IRC, ASTM and BS standards
Field
03 services
Work carried out at your site, under a supervising engineer.
- 0 – 60 mGeotechnical InvestigationRotary and percussion boreholes, SPT, undisturbed sampling and rock coring, logged strata by strata.IS 1892IS 2131IS 4453
- up to 1,000 tPile & Plate Load TestingVertical, lateral and pull-out pile testing with kentledge or anchor reaction, plus plate load tests.IS 2911 (Part 4)IS 1888ASTM D1143
- 0 – 3 mPavement & MaterialsSubgrade evaluation, field density, bitumen mix design and pavement condition surveys for road works.IRC 37IRC 81MoRTH Specifications
Laboratory
03 services
Testing on sealed samples in our NABL-scoped Bhubaneswar laboratory.
- sample scaleSoil Laboratory TestingIndex, classification, shear strength and consolidation testing in a temperature-controlled NABL lab.IS 2720 (all parts)IS 1498ASTM D2487
- sample scaleRock & Aggregate TestingStrength, abrasion and durability testing on rock cores, coarse aggregate, sand and building stone.IS 383IS 2386IS 9143
- sample scaleWater & Environmental TestingConstruction water, groundwater and soil contamination testing for compliance and suitability.IS 456IS 3025IS 10500
Specialist
04 services
Assessment that needs instruments, geophysics or a signed design opinion.
- 0 – 40 mPile Integrity & NDTLow-strain integrity testing, crosshole sonic logging and concrete assessment on existing structures.IS 14893IS 13311ASTM D5882
- 0 – 100 mGeophysical SurveyNon-intrusive imaging of bedrock, cavities and groundwater across large or access-restricted sites.IS 1893 (Part 1)ASTM D5777ASTM D4428
- site wideInstrumentation & MonitoringInstruments installed, read and reported: settlement, pore pressure, inclination and vibration.IS 5878DIN 4150ASTM D6230
- design stageFoundation Design AdvisoryBearing capacity, pile capacity, settlement and liquefaction assessment, signed by a chartered engineer.IS 6403IS 8009IS 2911
Send the site plan. Get a scope and a price in two days.
Tell us what you intend to build and where. We propose a borehole layout, a test schedule and a fixed cost. No obligation.