Skip to content
KonarkIntegrated

Pile Integrity & NDT

Find the necking, the soft toe and the cold joint before the cap is cast.

Specialist · 0 – 40 m · 4 standards

What we run

  • Pile Integrity Test (PIT), low strain
  • Crosshole Sonic Logging (CSL)
  • Ultrasonic pulse velocity and rebound hammer
  • Half-cell potential and resistivity for corrosion
  • Core extraction and carbonation depth
  • Cover meter and rebar mapping

Standards followed

  • IS 14893
  • IS 13311
  • ASTM D5882
  • ASTM D6760

What you receive

  • Pile-by-pile integrity classification
  • Structural condition report with repair guidance

Send the site plan. Get a scope and a price in two days.

Tell us what you intend to build and where. We propose a borehole layout, a test schedule and a fixed cost. No obligation.